[Invited speech]Application research of 3d parallel electrical method in site investigation of phosphogypsum stack
00
days
00
hours
00
minutes
00
seconds
00
days
00
hours
00
minutes
00
seconds

[Invited speech]Application research of 3d parallel electrical method in site investigation of phosphogypsum stack

Application research of 3d parallel electrical method in site investigation of phosphogypsum stack
ID:441 Submission ID:169 View Protection:ATTENDEE Updated Time:2024-05-20 11:26:43 Hits:558 Invited speech

Start Time:2024-05-31 15:00 (Asia/Shanghai)

Duration:20min

Session:[S3] Deep Underground Engineering and Energy Utilization » [S3-4] Afternoon of May 31st-4

No files

Abstract
Phosphogypsum, as an industrial solid waste, can lead to environmental pollution through the infiltration of its leachate into the groundwater system via subsurface flow pathways. Consequently, during the construction of phosphogypsum stacks, a detailed investigation of potential leakage pathways in the subsurface and surrounding areas is imperative. However, the traditional deployment of three-dimensional high-density electrical resistivity observation systems laid challenges.
Moreover, conventional resistivity data collection using standard instruments is time-consuming, particularly in realistically complex geological conditions, making it challenging to apply. Focusing on a specific phosphogypsum stacking site, this work integrates practical geological considerations and employs parallel electrical resistivity methods for data acquisition, obtaining a three-dimensional dataset within the observed area. Subsequently, three-dimensional electrical resistivity inversion imaging, incorporating topographic information, is employed for subsurface interpretation of the stacking site. A total of five anomalous zones were identified during the field survey, aligning with geological information revealed through borehole drilling.
Based on the 3D (three-dimensional) electrical resistivity inversion results and in conjunction with the actual geological conditions on-site, the resistivity values within the surveyed area were delineated. The overburden and water-bearing fracture zones exhibit lower resistivity, measuring less than 300 Ω·m. The moderately weathered limestone displays resistivity values ranging from 300 Ω·m to 1500 Ω·m, while the resistivity of intact limestone, fractured limestone, and overlying gravelly soil all surpasses 1500 Ω·m. This comprehensive investigation provides accurate guidance for the subsequent construction of impermeable curtains, aiming to prevent further environmental contamination.
Keywords
Parallel electrical method , 3D electrical resistivity inversion , Pollution prevention, Geological anomaly, Geological survey
Speaker
Guanqun Zhou
Hefei University of Technology

Submission Author
官群 周 School of Resources and Environmental Engineering, Hefei University of Technology
Comment submit
Verification code Change another
All comments

Contact us

Abstract and Paper:Ms. Zhang
Tel:(0086)-516-83995113
General Affairs:Ms. Zhang
Tel:(0086)-516-83590258
Hotel Services:Ms. ZHANG
Tel:15852197548
Sponsorship and Exhibition:Mr. Li
Tel:(0086)-516-83590246
Log in Registration Submit Abstract Hotel