            Engineering projects face risks over time. The risks generally may come from financial, technical, and social aspects. Given that the risks cannot be eliminated, considering the risks in the project evaluation is urgently needed. One common technique to evaluate engineering projects is through discounted cash flow where Net Present Value (NPV) is widely used. However, the existing NPV assumes the risks are transformed into one single number (i.e., discount rate). This paper discusses how the risks may affect a project economically and how we may benefit the proposed approach towards sustainability in the industry. The financial risk is quantified by weighted average cost of capital (WACC) model, the technical and social risk is assumed as a cost that is deducted from cash flow and modeled through probability concept. The proposed approach enhances the traditional DCF technique. Eventually, the sustainability of the mineral project can be achieved through managing the resources economically.
         
        
            Keywords
            risk profile in engineering projects evaluation
         
        
        
                Submission Author
                
                    
                                
                                    
                                                                    
                                Aldin  Ardian
                                Universitas Pembangunan Nasional “Veteran” Yogyakarta, Department of Mining  Engineering, Jalan Ring Road Utara, Yogyakarta, 55283, Indonesia
                            
                 
                     
        
     
Comment submit